
PROJECT PAGES

PROJECT VALVE STONE DRESSER NOV-26-1993
(Hand Made)

PROJECT VALVE STONE DRESSER NOV-26-1993
(Hand Made)

PROJECT Sandblasting Pressure Pot 1994
(Hand Made)

PROJECT 29in BOX BRAKE 1995
(Hand Made)

PROJECT SOCKET BOXES, MADE WITH THE BOX BRAKE
(Hand Made)

PROJECT HONE CAB 1996 (Hand Made)

PROJECT HONE CAB 1996 (Hand Made)

PROJECT HONE CAB AUG-23-1996, TOOK 3 1/2 MONTHS TO BUILD (Hand Made)
MODIFICATIONS SENCE THEN, SAFETY SWITCH COVER GUARD, SAFETY SWITCH CUT OFF FOR THE HEAD TRAVEL, BOTH SIDES, SAFETY SWITCH CUT OFF FOR THE UP AND DOWN HEAD STROKE, A AUTOMATIC MOTOR TIMER, WOODEN SHELF MADE ON THE SIDE FOR HOLDING THE HONING STONES, MOTOR SWING STOP on the inside. THE AIR AND ELECTRIC FOOT PEDAL TOOK 3 DAYS TO BUILD THEN TOOK 3 DAYS TO GET THE BUGS WORKED OUT.
1536.48 TO BUILD - This Machine will cost around $20,000.00
LIST OF MATERIALS I USED TO BUILD THE HONE CAB CLICK HERE
